Selection of new appropriate mining method: case of Boukhadra iron ore mine, NE Algeria

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…From the tectonic point of view, the region of Boukhadra is marked by two important tectonic phases; the folding phase of direction NE-SO and the phase of brittle tectonics have generated base movements, which are at the origin of the formation of the Tebessa-Morsott and Ouled-Boughanem ditches as well as the Boudjaber horst. Other minor faults with minor releases are also reported in the immediate vicinity of the deposit [17]. Mining is carried out according to two modes with open pit and underground, the present work relates to the exploitation with open pit.…”
Section: Figure 1 Geographical Location Of Boukhadra's Minementioning
confidence: 94%
“…From the tectonic point of view, the region of Boukhadra is marked by two important tectonic phases; the folding phase of direction NE-SO and the phase of brittle tectonics have generated base movements, which are at the origin of the formation of the Tebessa-Morsott and Ouled-Boughanem ditches as well as the Boudjaber horst. Other minor faults with minor releases are also reported in the immediate vicinity of the deposit [17]. Mining is carried out according to two modes with open pit and underground, the present work relates to the exploitation with open pit.…”
Section: Figure 1 Geographical Location Of Boukhadra's Minementioning
confidence: 94%
“…The impact of mineral extraction on the change in the stress-strain state in the rock massif has been established. The effect of regional stress fields on the safety of mining operations is determined [20,21]. The seismic influence on the resistance of the rock mass to exposure was considered [22,23].…”
Section: Introductionmentioning
confidence: 99%
“…Based on this, he stated that the planning of such large-scale operations is laborious and cannot be done manually. Therefore, in the mine planning process, detailed studies should be conducted in which every useful data obtained from the mine area is evaluated, and many alternatives are produced by testing variable input values using mining software [7]. Studies were carried out on the development and application of mathematical models, optimising the production schedule and applying operations research methods in mining [8][9][10].…”
Section: Introductionmentioning
confidence: 99%