2015
DOI: 10.1007/s12665-015-4604-3
|View full text |Cite
|
Sign up to set email alerts
|

Sediment control interventions and river flow dynamics: impact on sediment entry into the large canals

Abstract: At Marala barrage, two canals, i.e. Marala Ravi Link Canal (MRLC) and Upper Chenab Canal (UCC) off-take from left side of the River Chenab. MRLC has a very old history of experiencing sedimentation issues. Several attempts have been made to counterfoil or minimize this problem in the recent past. Two remarkable measures are the remodeling of MRLC in 2000-2001 (in-tervention-1) and the shifting of the confluence point of a heavily sediment-laden upstream tributary of the Chenab River by construction of a spur d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

1
1
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 12 publications
(11 reference statements)
1
1
0
Order By: Relevance
“…It suggests that the dam also contributes to high sediment load during the flushing operation. Similar sediment concentration scatter was observed in the Upper Chenab Canal (UCC) and Marala Link Canal (MRLC) in Pakistan by [49], where average sediment concentrations were 450 and 500 ppm, respectively. However, the sediment concentration observed at the Gomal river monitoring station is much higher than UCC and MRLC.…”
Section: Annual Sediment Yieldsupporting
confidence: 60%
See 1 more Smart Citation
“…It suggests that the dam also contributes to high sediment load during the flushing operation. Similar sediment concentration scatter was observed in the Upper Chenab Canal (UCC) and Marala Link Canal (MRLC) in Pakistan by [49], where average sediment concentrations were 450 and 500 ppm, respectively. However, the sediment concentration observed at the Gomal river monitoring station is much higher than UCC and MRLC.…”
Section: Annual Sediment Yieldsupporting
confidence: 60%
“…The amount of bedload in river flows during rainfall events assumed as 10% of suspended sediment load as suggested by [48]. For improved estimates of the sediment load, the continuous records approach applied by [49] can be used, but it requires the hourly or daily sediment concentration data. the continuous records approach applied by [49] can be used, but it requires the hourly or daily sediment concentration data.…”
Section: Sediment Transport Modelingmentioning
confidence: 99%