Scenario Analysis in the Electric Power Industry under the Implementation of the Electricity Market Reform and a Carbon Policy in China

Abstract: In China, electricity market reform was first implemented in 2015. At the same time, the national carbon market was built, along with the electricity industry, which was considered a breakthrough. Some key considerations for the future development of China's electricity system include the implementation of demand-side measures in order to adjust the peak-to-valley difference and the economic dispatch of increasing intermittent renewable energy and traditional energy in the process of power marketization with t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(7 citation statements)
references
References 36 publications
0
7
0
Order By: Relevance
“…8760 hours are generally assumed in estimations of total annual capacity. A power plant's capacity factor is the ratio of its actual energy output (in kWh), over a specified period, to the total energy that could be produced if the plant operated at full capacity without the need for plant maintenance or output reductions ( Almeida Prado and Berg, 2013 ; Wang and Li, 2019 ). The actual electricity production is divided by the maximum possible electricity output of a power plant over time ( Neill and Hashemi, 2018 ).…”
Section: Methodsmentioning
confidence: 99%
“…8760 hours are generally assumed in estimations of total annual capacity. A power plant's capacity factor is the ratio of its actual energy output (in kWh), over a specified period, to the total energy that could be produced if the plant operated at full capacity without the need for plant maintenance or output reductions ( Almeida Prado and Berg, 2013 ; Wang and Li, 2019 ). The actual electricity production is divided by the maximum possible electricity output of a power plant over time ( Neill and Hashemi, 2018 ).…”
Section: Methodsmentioning
confidence: 99%
“…One of the most relevant work in this field comes from Wang and Li (2019). They have done scenario analysis in the electric power industry in China under the implementation of the electricity market reform and carbon policy in China.…”
Section: Literature Reviewmentioning
confidence: 99%
“…One of the most relevant work is by Wang and Li [14]. They have done a scenario analysis in the electric power industry in China under the implementation of the electricity market reform and a carbon policy in China.…”
Section: Literature Reviewmentioning