2004
DOI: 10.1080/0144619042000201367
|View full text |Cite
|
Sign up to set email alerts
|

Safety and production: an integrated planning and control model

Abstract: A safety planning and control model (SPC) has been integrated into the production planning and control process. The model integrates safety into three hierarchical levels of production control. Safety long-term planning starts with the preliminary hazard analysis (PHA) of construction processes. These plans are detailed and updated at both medium- and short-term planning levels. The main performance measure adopted for safety evaluation at the short-term level is the Percentage of Safe Work Packages (PSW). It … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
42
0
9

Year Published

2005
2005
2022
2022

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 77 publications
(51 citation statements)
references
References 5 publications
0
42
0
9
Order By: Relevance
“…However, studies have shown that designers in general-not just in the construction industry-fall short of satisfying this obligation (Behm, 2005;Fadier and De la Garza, 2006;Frijters and Swuste, 2008). Some earlier studies have indicated that safety planning and control methods need to be improved even beyond what is required by regulations and standards (Saurin et al 2004). …”
Section: Introductionmentioning
confidence: 99%
“…However, studies have shown that designers in general-not just in the construction industry-fall short of satisfying this obligation (Behm, 2005;Fadier and De la Garza, 2006;Frijters and Swuste, 2008). Some earlier studies have indicated that safety planning and control methods need to be improved even beyond what is required by regulations and standards (Saurin et al 2004). …”
Section: Introductionmentioning
confidence: 99%
“…There is evidence that projects managed on a Lean basis are safer than those managed with traditional practices- (Thomassen 2003;Saurin et al 2004;Nahmens and Ikuma 2009;Leino 2010) and we don't know why. Some facts: 20% of all industrial deaths occur on construction projects.…”
Section: Introductionmentioning
confidence: 99%
“…De acordo com Suraji et al (2001), muitas dessas perdas têm sua origem na ausência ou em defi ciências do processo de planejamento e controle da segurança. Por esta razão, este processo vem sendo objeto de estudo de vários autores (KARTAM, 1997;TRANI;LATICINA, 2002;HINZE, 1998;SAURIN et al, 2004). Além disso, o planejamento e controle da segurança é requisito obrigatório de normas opcionais e obrigatórias de segurança, sendo também uma prática comumente empregada por empresas líderes em gestão de segurança (HINZE, 2002;SAURIN, 2002).…”
Section: Introductionunclassified
“…Diversos estudos indicam que se pode aumentar a efi ciên-cia e efi cácia dos planos de segurança através da integração do planejamento da segurança e da produção (CIRIBINI; RIGAMONTI, 1999;KARTAM, 1997;TRANI;LATICI-NA, 2002;HINZE, 1998;SAURIN et al, 2004). Entretanto, a maioria dos estudos realizados adota uma visão muito restrita de planejamento e controle da segurança.…”
Section: Introductionunclassified
See 1 more Smart Citation