RMG Crane Scheduling and Stacking

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 33 publications
0
4
0
Order By: Relevance
“…Further, new conceptual YCs that have recently been introduced include overhead bridge cranes that are being used in Singapore, two non-crossing rail mounted gantry crane (RMGC) in a block, two crossing RMGC in a block, and two non-crossing RMGCs with one additional crossing RMGC. New operational methods must be developed for the efficient operation of these new conceptual YCs (Kemme 2011(Kemme , 2012. Impacts of different yard layouts on the operational performance of the yard needs to be studies further (Petering 2013;Kim 2010, 2013).…”
Section: Real-time Controlmentioning
confidence: 99%
“…Further, new conceptual YCs that have recently been introduced include overhead bridge cranes that are being used in Singapore, two non-crossing rail mounted gantry crane (RMGC) in a block, two crossing RMGC in a block, and two non-crossing RMGCs with one additional crossing RMGC. New operational methods must be developed for the efficient operation of these new conceptual YCs (Kemme 2011(Kemme , 2012. Impacts of different yard layouts on the operational performance of the yard needs to be studies further (Petering 2013;Kim 2010, 2013).…”
Section: Real-time Controlmentioning
confidence: 99%
“…In order to solve the SVSP on the tier, we rely on work carried out in the area of CSP. [11] evaluates and classifies possible strategies for preselection and allocation ( Figure 1). Adapted to the SVSP on the tier, the following preselection strategies can be formulated:…”
Section: Solution Approaches For the Shuttle Vehicle Scheduling Problemmentioning
confidence: 99%
“…According to [11], one option to conduct the job allocation is by means of block sequencing or dynamic sequencing. In this case, the concepts of block sequencing and dynamic sequencing, in conjunction with rolling scheduling, are both based either on optimal solution methods or on approximate solutions using heuristics.…”
Section: T Nmentioning
confidence: 99%
“…Stacking crane scheduling is one of the main parts of planning container terminal activities, and there has been a rapid growth of research in this area over the last decade. Comprehensive literature reviews of problems, models and solution methods in storage yard operations of a container terminal are provided by Stahlbock and Voß , Kemme , Carlo, Vis, and Roodbergen , Gharehgozli et al , He et al , Li et al , Wu et al , van Dijk , Kaveshgar and Huynh , Shu et al and Boysen et al .…”
Section: Introductionmentioning