2021
DOI: 10.1016/j.renene.2020.08.110
|View full text |Cite
|
Sign up to set email alerts
|

Risk assessment of offshore photovoltaic projects under probabilistic linguistic environment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 31 publications
(14 citation statements)
references
References 44 publications
0
3
0
Order By: Relevance
“…However, the overall aim of risk assessment is to identify and manage risks to ensure the safe and reliable operation of the activity, system, or project being assessed [32], [35]- [36]. Conducting a risk assessment for FSPV systems requires tools to identify potential hazards, evaluate the likelihood and consequences of each hazard, and develop effective mitigation strategies, as shown in Figure 4 [37], [38]- [43]. The scope of risk assessment and policy development for FSPV typically includes technical, financial, environmental, social, and regulatory risks [21].…”
Section: Risk Assessmentmentioning
confidence: 99%
“…However, the overall aim of risk assessment is to identify and manage risks to ensure the safe and reliable operation of the activity, system, or project being assessed [32], [35]- [36]. Conducting a risk assessment for FSPV systems requires tools to identify potential hazards, evaluate the likelihood and consequences of each hazard, and develop effective mitigation strategies, as shown in Figure 4 [37], [38]- [43]. The scope of risk assessment and policy development for FSPV typically includes technical, financial, environmental, social, and regulatory risks [21].…”
Section: Risk Assessmentmentioning
confidence: 99%
“…Moreover, literature published by domestic and foreign scholars were searched using keywords such as offshore wind power, offshore photovoltaic, and offshore new energy projects. We obtained extensive articles on the risk assessment of these projects [6][7][8][9][10][14][15][16][17]. At the same time, the risk factors can be collected by referring to the conference reports of offshore new energy projects and case studies of existing offshore new energy projects.…”
Section: The Construction Of the Indicator System Of Risk Assessment ...mentioning
confidence: 99%
“…A fuzzy comprehensive evaluation model was also constructed by combining the hesitant linguistic fuzzy sets, triangular fuzzy sets, and analytic network process (ANP) methods. Gao et al [15] considered market risks, established an index system including economic, technical, environmental, and market risk factors, and established a comprehensive risk assessment framework for offshore PV projects under probabilistic language term sets. Considering the uncertainty of processing information and the confidence of expert judgement, Zhou et al [16] established a risk assessment model of China's offshore photovoltaic power generation projects with D-number and ANP method.…”
Section: Introductionmentioning
confidence: 99%
“…In addition, some risk assessment studies related to photovoltaic and other new energy construction projects also provide a good reference for this paper. Regarding the construction of a risk indicator system, Jianwei Gao et al summarized the construction risks of offshore photovoltaic projects as economic, technical, environmental, and market risks [22]. Yunna Wu et al found that financing difficulties, unclear division of responsibilities and obligations, lack of operational experience, and material supply and installation defects are the most critical risk factors for photovoltaic poverty alleviation projects [23].…”
Section: Literature Reviewmentioning
confidence: 99%