2008 IEEE/PES Transmission and Distribution Conference and Exposition 2008
DOI: 10.1109/tdc.2008.4517065
|View full text |Cite
|
Sign up to set email alerts
|

Review of reactive power planning: objectives, constraints, and algorithms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2020
2020

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 42 publications
(72 reference statements)
0
1
0
Order By: Relevance
“…In this paper, reactive power sources are modelled using continuous variables which is a commonly used assumption to simplify the model (in reality, the resources have a discrete nature). In (23), we consider installation and operation costs of the resources which is more realistic with cost of more complexity [63]. In (25)- (27), the maximum possible active/ reactive load shedding and RPG curtailment among all possible contingency are determined.…”
Section: Deterministic Formulation Of Tnep and Rppmentioning
confidence: 99%
“…In this paper, reactive power sources are modelled using continuous variables which is a commonly used assumption to simplify the model (in reality, the resources have a discrete nature). In (23), we consider installation and operation costs of the resources which is more realistic with cost of more complexity [63]. In (25)- (27), the maximum possible active/ reactive load shedding and RPG curtailment among all possible contingency are determined.…”
Section: Deterministic Formulation Of Tnep and Rppmentioning
confidence: 99%