Flexible two‐stage robust model for moving the transmission and reactive power infrastructures expansion planning towards power system integration of renewables

Abstract: This study proposes a two-stage robust optimisation framework to model uncertainties in construction cost, load and renewable power generations (RPGs) in the coordinated transmission and reactive power infrastructure expansion planning problem. The proposed planning model, based on the network AC model and its voltage constraints, is represented as a mixedinteger linear programing problem with the aim of minimising: (i) the construction costs of lines, (ii) installation cost of reactive power resources and (ii… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(8 citation statements)
references
References 60 publications
0
8
0
Order By: Relevance
“…In [37], the reliability evaluation of power system integrated with wind technology is done using a probabilistic technique, FIGURE 6 Reliability assessment of power grid system [36]. ASAI, average service availability index; CAIDI, customer average interruption duration index; SAIDI, system average interruption duration index; SAIFI, system average interruption frequency index; DER, distributed energy resource; SD, storage device.…”
Section: Simulation Methodsmentioning
confidence: 99%
See 2 more Smart Citations
“…In [37], the reliability evaluation of power system integrated with wind technology is done using a probabilistic technique, FIGURE 6 Reliability assessment of power grid system [36]. ASAI, average service availability index; CAIDI, customer average interruption duration index; SAIDI, system average interruption duration index; SAIFI, system average interruption frequency index; DER, distributed energy resource; SD, storage device.…”
Section: Simulation Methodsmentioning
confidence: 99%
“…13). The steady state probabilities is given by Equations ( 5) and (6). Similarly, for a two repairable component system the steady state probabilities is given by Equations ( 7) and (8).…”
Section: Markov Modelmentioning
confidence: 99%
See 1 more Smart Citation
“…The controllability and efficiency of fault current limiters reported in [21] were improved using series-type FACTS devices in [22]. The second stream of research, however, focuses on boosting different flexibility requirements in the transmission grids regardless of fault conditions [23][24][25][26][27][28][29][30][31][32][33][34][35][36][37][38][39].…”
Section: Literature Review and Research Gapsmentioning
confidence: 99%
“…Constraints (36) and (37) also ensure the same for the FCL-HTS cables. The fourth group, relationships (38)- (39), corresponds to the financial constraints [23]. Constraints (38) and (39) state that the maximum available investment budgets cannot exceed the predefined cap values at stage t and all stages, respectively.…”
Section: Mathematical Model Of the Proposed Multistage Ac Tep Problemmentioning