Resource allocation for robust project scheduling

Abstract: Abstract. The paper presents a formal description of the resource allocation problem for resource-constrained project scheduling. A schedule can be executed by various resource flow networks which may differ in terms of resistance to disruptions occurring during project execution. The authors define such criteria of evaluating a resource flow network which can be more useful than robustness metrics used so far in the research. The authors discuss the importance of robust scheduling for execution projects and p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
6
1

Relationship

2
5

Authors

Journals

citations
Cited by 11 publications
(8 citation statements)
references
References 6 publications
0
8
0
Order By: Relevance
“…For a review of resource allocation algorithms, the reader is referred to papers [30,32]. In this paper, the procedures are described used in computational experiments.…”
Section: Resource Allocationmentioning
confidence: 99%
“…For a review of resource allocation algorithms, the reader is referred to papers [30,32]. In this paper, the procedures are described used in computational experiments.…”
Section: Resource Allocationmentioning
confidence: 99%
“…Resource allocation problem is most often reduced to the problem of minimising the number of additional ordering relations between tasks [23][24]. Each additional ordering constraint reduces schedule robustness.…”
Section: Proactive Schedulingmentioning
confidence: 99%
“…4 is, the reason being the lower number of additional ordering constraints. For more elaborate analyses of the problem, along with the description of algorithms used, refer to works about resource allocation in project scheduling [23,24].…”
Section: Robustness Of Schedules For Project Scheduling Problem With mentioning
confidence: 99%
“…Therefore, the smaller is the stby(a), the better the robustness of the schedule becomes [19]. Klimek and Łebkowski identified a series of criteria of evaluating resource flow network, and they compared that to the famous indicator flexibility to realize a more accurate analysis of the resource flow network [20]. Lamas and Demeulemeester developed a new procedure for generating a proactive baseline schedule for the resource-constrained project scheduling problem.…”
Section: Introductionmentioning
confidence: 99%