IPTC 2008: International Petroleum Technology Conference 2008
DOI: 10.3997/2214-4609-pdb.148.spe114127
|View full text |Cite
|
Sign up to set email alerts
|

Reliability of Multiphase Flowmeters and Test Separators at High Water Cut

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2012
2012
2019
2019

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Highpressure gas is injected at the gas manifold into the annulus, with injection rate being fixed by a variable orifice controller. Gas injection rate is measured using an orifice plate meter (Chia and Hussain 1999;Sutton 2008;Ojukwu and Edwards 2008). Well head flowing pressure is registered using a pressure recorder installed at the wellhead.…”
Section: Data Descriptionmentioning
confidence: 99%
“…Highpressure gas is injected at the gas manifold into the annulus, with injection rate being fixed by a variable orifice controller. Gas injection rate is measured using an orifice plate meter (Chia and Hussain 1999;Sutton 2008;Ojukwu and Edwards 2008). Well head flowing pressure is registered using a pressure recorder installed at the wellhead.…”
Section: Data Descriptionmentioning
confidence: 99%