2014
DOI: 10.1049/iet-gtd.2013.0251
|View full text |Cite
|
Sign up to set email alerts
|

Reliability‐based phasor measurement unit placement in power systems considering transmission line outages and channel limits

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
38
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 51 publications
(38 citation statements)
references
References 34 publications
0
38
0
Order By: Relevance
“…WAMS collects data from PMU installed in the power system and then based on online data the power system status is assessed. To be implemented in a real power system, the sufficient number of PMU with its communication support should be installed in power system as presented in [5], [6]. Every time period (for example every 20 minutes), the data from PMU is calculated for this application with contingency selection is determined by TSO.…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…WAMS collects data from PMU installed in the power system and then based on online data the power system status is assessed. To be implemented in a real power system, the sufficient number of PMU with its communication support should be installed in power system as presented in [5], [6]. Every time period (for example every 20 minutes), the data from PMU is calculated for this application with contingency selection is determined by TSO.…”
Section: Discussionmentioning
confidence: 99%
“…System operators should select the adequate number of contingencies, considering their occurrence probability (called risk-based contingency selection in this paper). The proposed method implements the risk-based N-1 line contingency selection as an optimization problem formulated as follow [5], [16].…”
Section: B Risk-based N-1 Contingency Selectionmentioning
confidence: 99%
See 1 more Smart Citation
“…; at the same time, research was conducted on the improvement of the reliability and accuracy of state estimation. As regards the improvement of state estimation reliability in PMU networks, there are studies on redundant PMU placement to handle omissions in observed data because of PMU failures and single line outages . However, the accuracy of actual state estimation calculations is not taken into account when maximizing reliability indices, while PMU placement cost increases due to redundancy, which is not a workable solution.…”
Section: Introductionmentioning
confidence: 99%
“…Reliability-based PMU placement techniques for achieving a desired level of reliability, while satisfying full observability, have been recently developed [9], [10]. Two reliability indices, loss of data expectation (LODE) and observability reliability (OR) are suggested in [10] to quantify the observability reliability of power systems associated with PMU and transmission branch outages.…”
Section: Introductionmentioning
confidence: 99%