2014
DOI: 10.1007/s12206-014-0907-7
|View full text |Cite
|
Sign up to set email alerts
|

Reliability and risk treatment centered maintenance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 17 publications
0
2
0
Order By: Relevance
“…For instance, RCM was extended to consider a broader risk perspective with the use of an uncertainty analysis incorporated into the traditional RCM method [33]. Moreover, RCM, Risk-Based Inspection (RBI), and Safety Instrumented Function Process (SIFpro) were merged into a new methodology that still treats RCM and RBI individually, sharing a common step of preparation [34]. Nonetheless, these two works offer more of an expansion upon RCM by incorporating elements related to risk analysis, rather than outright merging RCM and RBM into a single method.…”
Section: Rcm and Rbm Methods As Support For Maintenancementioning
confidence: 99%
“…For instance, RCM was extended to consider a broader risk perspective with the use of an uncertainty analysis incorporated into the traditional RCM method [33]. Moreover, RCM, Risk-Based Inspection (RBI), and Safety Instrumented Function Process (SIFpro) were merged into a new methodology that still treats RCM and RBI individually, sharing a common step of preparation [34]. Nonetheless, these two works offer more of an expansion upon RCM by incorporating elements related to risk analysis, rather than outright merging RCM and RBM into a single method.…”
Section: Rcm and Rbm Methods As Support For Maintenancementioning
confidence: 99%
“…Igba et al (2013) discussed how a system's thinking approach can be used to identify the relevant aspects and possible interactions between the RCM approach and wind turbine gearboxes. Pexa et al (2014) proposed a methodology for application of well-known tools RCM, RBI and SIF-pro, with the aim to treat risks by means of suitable maintenance. The proposed methodology suggested having just one managing team for reliability and risk treatment centered maintenance (RRTCM), employing existing RCM, RBI and SIF-pro tools concurrently.…”
Section: Literature Reviewmentioning
confidence: 99%