2009 WRI International Conference on Communications and Mobile Computing 2009
DOI: 10.1109/cmc.2009.33
|View full text |Cite
|
Sign up to set email alerts
|

Reliability Analysis of CTCS Based on Two GSM-R Double Layers Networks Structures

Abstract: In CTCS (China Train Control System) level-3 and level-4,GSM-R is the wireless communications system, and it is a platform to transfer security data of train control. As the train control system is safety critical system, once the security data are delayed or lost by GSM-R, an emergency brake will be executed, or even the danger will happen. This paper bases on two different existing GSM-R double layers networks, and establishes the channel and train control system models, then analyzes the relation between t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2012
2012
2021
2021

Publication Types

Select...
4
2

Relationship

1
5

Authors

Journals

citations
Cited by 12 publications
(4 citation statements)
references
References 5 publications
(3 reference statements)
0
3
0
Order By: Relevance
“…It is used for voice calls, data transmission and traffic control. In this system, the communication for drivers and signalers is secure as the coverage of the rail network is thorough, including deep cuttings and tunnels 32 . GSM‐R and GSM system are basically the same but GSM‐R has railway‐specific functions based on European standards and specifications 2 …”
Section: Cbtc Operationmentioning
confidence: 99%
“…It is used for voice calls, data transmission and traffic control. In this system, the communication for drivers and signalers is secure as the coverage of the rail network is thorough, including deep cuttings and tunnels 32 . GSM‐R and GSM system are basically the same but GSM‐R has railway‐specific functions based on European standards and specifications 2 …”
Section: Cbtc Operationmentioning
confidence: 99%
“…These parameters are taken from the Refs. [5,6,12,[19][20][21]. Table 3 provides the parameter values of different failure and recovery models.…”
Section: Case Analysis and Parameter Configurationmentioning
confidence: 99%
“…The reliability analysis of GSM-R redundant network is performed in [2][3]. A handover trigger scheme for high-speed railway is proposed in [4].…”
Section: Introductionmentioning
confidence: 99%