2014
DOI: 10.1016/j.datak.2014.07.006
|View full text |Cite
|
Sign up to set email alerts
|

Reducing the gap between experts' knowledge and data: The TOM4D methodology

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
5
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
3
3
1

Relationship

1
6

Authors

Journals

citations
Cited by 14 publications
(5 citation statements)
references
References 44 publications
0
5
0
Order By: Relevance
“…Basically, such approaches are confronted with the mismatch between a priori models and raw data provided by sensors (cf. [6] for a detailed analysis of this problem). This problem is currently approached through the adaptation of models with available data sets [7].…”
Section: Related Workmentioning
confidence: 99%
See 1 more Smart Citation
“…Basically, such approaches are confronted with the mismatch between a priori models and raw data provided by sensors (cf. [6] for a detailed analysis of this problem). This problem is currently approached through the adaptation of models with available data sets [7].…”
Section: Related Workmentioning
confidence: 99%
“…The TOT constitutes the common mathematical framework of (i) a Knowledge Engineering methodology called TOM4D (Timed Observation Modeling for Diagnosis, cf. [6] for a complete introduction), specifically designed to model a monitored dynamic process, (ii) the KDD process TOM4L detailed with more detail sin section IV, and (iii) an abstraction method called TOM4A (Timed Observation Method for Abstraction, [6], [21]), inspired from the Knowledge Level of Newell [22] and the Method of Gradients of Abstraction of Floridi [20], allowing to reduce the gap between experts and machines. A Java tool called TOM4K (Timed Observations Management of Knowledge, Figure 1) implements the main concepts of the TOT.…”
Section: Related Workmentioning
confidence: 99%
“…They also reported a computer program entitled "TDSS" to assist both senior and junior site layout planning engineer. In [146], the authors provided a framework named "TOM4D" to integrate tacit knowledge and explicit knowledge. This framework has been used in security of the dam of Cubblize (France), and the resultant TOM4D models have been validated by the hydraulic dam experts of the French governmental organization (Cemagref), which controls the security of hydraulic civil engineering structures.…”
Section: Tacit Knowledge Applicationmentioning
confidence: 99%
“…On the other hand, there is generally a lack of quality of information mainly due to collection processes and low operating complex data . It is necessary procedures for the collection and management of simpler data and adjusted to real needs, facilitating the interpretation and analysis . Here are some questions generally required by the area of production and maintenance, presented in an integrated way.…”
Section: Introductionmentioning
confidence: 99%
“…Specifically, 26 DM techniques have been reviewed . Nevertheless, the main revised methods taken into account to develop Graphical Analysis for Operation Management Method (GAOM) have been: Balanced Scorecard, Total Productive Maintenance, Overall Equipment Effectiveness, and the Graphical Analysis for Maintenance Management (GAMM) method…”
Section: Introductionmentioning
confidence: 99%