2021
DOI: 10.1016/j.ijepes.2020.106677
|View full text |Cite
|
Sign up to set email alerts
|

Redesigning capacity market to include flexibility via ramp constraints in high-renewable penetrated system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(8 citation statements)
references
References 27 publications
0
7
0
Order By: Relevance
“…As seen in Table 5, in both EbM and PbM, the revenue of inflexible unit is higher, and this is a real flexibility issue that is probable in electricity markets as reported in References 35,36. According to what is observed here, pure PbM structure is not sufficient to overcome the flexibility challenge and needs further supports, such as incorporating energy storage systems 37 and/or ramp market, 38,39 flexible demand response programs, 40 differentiating flexibility feature within the capacity market, 41 or incorporating decomposed dual variables in the billing procedures 36 . Still, the above results show that from the flexibility point of view, pure PbM structure outperforms pure EbM.…”
Section: Study #3: Flexibility Advantage In Ebm and Pbmmentioning
confidence: 62%
“…As seen in Table 5, in both EbM and PbM, the revenue of inflexible unit is higher, and this is a real flexibility issue that is probable in electricity markets as reported in References 35,36. According to what is observed here, pure PbM structure is not sufficient to overcome the flexibility challenge and needs further supports, such as incorporating energy storage systems 37 and/or ramp market, 38,39 flexible demand response programs, 40 differentiating flexibility feature within the capacity market, 41 or incorporating decomposed dual variables in the billing procedures 36 . Still, the above results show that from the flexibility point of view, pure PbM structure outperforms pure EbM.…”
Section: Study #3: Flexibility Advantage In Ebm and Pbmmentioning
confidence: 62%
“…Since there are many power plants and CHPs in the power system, their exclusion from the capacity auctions may cause an impulse for investing in new, low-emission power generation units. However, it is crucial to consider the current design of the Polish capacity market to avoid problems with different flexibility of power units [26].…”
Section: Discussionmentioning
confidence: 99%
“…Fang et al (2021) pointed out the current design of the capacity markets does not consider the difference in the flexibility of power units. The authors propose the new framework of capacity remuneration mechanism that would differentiate the characteristic of units and provide better incentives for peak load generation capacity [26]. Schäfer and Altvater (2021) also indicate that the capacity market does not provide the same chances for each power unit.…”
Section: Literature Reviewmentioning
confidence: 99%
“…After the grid connection of large scale renewable energy generation, relying solely on generation-side resources cannot fully meet the requirements of reliable, safe and efficient operation of the power system with renewable energy as the main form of power generation in the grid, and new available resources must be tapped from the customer side [21] . DR resources can induce dispatchable, temporary load reductions during system load peaks to ensure system capacity adequacy.…”
Section: B Impact On Generation Capacity Adequacy Under New-type Powe...mentioning
confidence: 99%