Reactive Adaptation of Construction Schedules by Applying Simulation-Based Optimization

Abstract: -This paper deals with the adaption of construction schedule due to real-time data. This real-time data needs to be evaluated regarding the effects on the schedule. If significant delays or other problems are identified, the schedule should be adapted. That means that under the existing condition a new schedule needs to be generated. Thereby, different constraints of the target schedule like contracted delivery dates, milestones or resource allocation should be considered. In the presented approach these addit… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 27 publications
0
1
0
Order By: Relevance
“…Another possibility to cope with scarce information to define input data for simulation studies is provided by the application of Fuzzy Set Theory (Bruni et al., ). Szczesny et al () and Szczesny and König () applied the concept to derive input data for the simulation of high‐rise building construction. Zhang et al () presented an approach based on Fuzzy Set Theory to determine the structural health of shielded tunnel constructions.…”
Section: Processing Input Datamentioning
confidence: 99%
“…Another possibility to cope with scarce information to define input data for simulation studies is provided by the application of Fuzzy Set Theory (Bruni et al., ). Szczesny et al () and Szczesny and König () applied the concept to derive input data for the simulation of high‐rise building construction. Zhang et al () presented an approach based on Fuzzy Set Theory to determine the structural health of shielded tunnel constructions.…”
Section: Processing Input Datamentioning
confidence: 99%