2020
DOI: 10.1109/access.2020.2968721
|View full text |Cite
|
Sign up to set email alerts
|

Railway Passenger Flow Recognition Algorithm for Terminal Station Based on Cost Theory and Automatic Frequency Control

Abstract: Passenger flow recognition is the basis of railway passenger terminal station and railway operation department for daily management, it has an important significance for the adjustment of the operation plan, the choice of the passenger travel mode, the estimation of the travel time and so on. It is especially important for the optimization of the operating plan for the railway route under the railway transportation mode. Therefore, considering the instability and complexity of passenger flow change in the rail… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0
1

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1

Relationship

2
3

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 16 publications
0
4
0
1
Order By: Relevance
“…construction engineering [18]. e relevant research results of this chapter can lay a theoretical foundation for the quantification of the whole process application value, economic benefit analysis, and value promotion of BIM in green building.…”
Section: Sustainable Buildingmentioning
confidence: 96%
“…construction engineering [18]. e relevant research results of this chapter can lay a theoretical foundation for the quantification of the whole process application value, economic benefit analysis, and value promotion of BIM in green building.…”
Section: Sustainable Buildingmentioning
confidence: 96%
“…With the start of China–Laos railway construction, the types and attributes of risks have been different from the traditional domestic railway projects in the past. From transnational cooperation and exchange to the international political, economic and social, and so on, all of these will have an impact on project construction (Guo et al , 2020). Therefore, it is necessary to evaluate the potential investment risks of the project in order to carry out risk management objectively.…”
Section: Methodsmentioning
confidence: 99%
“…+ stands for the proceeds from the sale of the remaining capacity in the spot market, and KC stands for the fixed production cost [40].…”
Section: Stackelberg Model Constructionmentioning
confidence: 99%