1977
DOI: 10.1016/0305-0483(77)90104-9
|View full text |Cite
|
Sign up to set email alerts
|

Quantitative models for optimal rest period scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

1993
1993
2023
2023

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 21 publications
(7 citation statements)
references
References 10 publications
0
7
0
Order By: Relevance
“…The simulation model was used to numerically perform sensitivity analysis. In a short note, Bechtold (1979) complements the numerical sensitivity analysis approach of Gentzler et al (1977) with an analytic sensitivity analysis approach.…”
Section: Operations Research Approaches To Work-rest Schedulingmentioning
confidence: 98%
See 1 more Smart Citation
“…The simulation model was used to numerically perform sensitivity analysis. In a short note, Bechtold (1979) complements the numerical sensitivity analysis approach of Gentzler et al (1977) with an analytic sensitivity analysis approach.…”
Section: Operations Research Approaches To Work-rest Schedulingmentioning
confidence: 98%
“…A linear rate of recovery was assumed. Gentzler et al (1977) modeled multiple breaks using a mathematical model as well as a simulation model. The length of each break was fixed and always ensured full recovery, and the work rate declined at a linear or exponential rate.…”
Section: Operations Research Approaches To Work-rest Schedulingmentioning
confidence: 99%
“…Scheduling a Rest Period for a Work Group, 4 Eilon (1964) pioneered the concept of modeling performance with the objective of determining the optimal length and placement of one rest period, over a finite time horizon, for a single employee. Gentzler, Khalil and Sivazlian (1977) and Bechtold (1979) developed multirest period models for individuals over infinite and finite time horizons, respectively.…”
Section: Scheduling a Rest Period For Amentioning
confidence: 99%
“…In the selective maintenance studies mentioned above, the work rate decay of a repairperson is ignored and the duration of the maintenance action is usually assumed to be determined or follow a certain distribution 15,23 . However, in practice, the work rate of a repairperson will decay due to the fatigue effect 8,30,31 . For example, a repairperson needs to hold the wrench and install the screws when repairing car chassis components.…”
Section: Introductionmentioning
confidence: 99%