Quality issues related to the design and construction stage of a project in the Indian construction industry

Abstract: PurposeQuality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The contribution of stakeholders, especially the architects is generally suspended though it has huge significance in terms of cost and time related to quality. This research endeavors to examine the issues related to the design and construction stages of the project from architects' purview, to understand the relative importance of … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
(9 citation statements)
references
References 34 publications
1
7
0
Order By: Relevance
“…This new proposition suggests that it is recommended to give the SC responsibility already in the design stage to prevent problems in later stages. This is in keeping with other studies, which state that the design stage can have a significant impact on later stages in construction projects (Alsulamy, 2022;Khan et al, 2021;Zaneldin, 2016). However, it contrasts with other literature that states that late involvement (construction stage) of the SC is considered a preferred way of sub-contracting, despite negative characteristics (Lee et al, 2009).…”
Section: Discussionsupporting
confidence: 91%
See 1 more Smart Citation
“…This new proposition suggests that it is recommended to give the SC responsibility already in the design stage to prevent problems in later stages. This is in keeping with other studies, which state that the design stage can have a significant impact on later stages in construction projects (Alsulamy, 2022;Khan et al, 2021;Zaneldin, 2016). However, it contrasts with other literature that states that late involvement (construction stage) of the SC is considered a preferred way of sub-contracting, despite negative characteristics (Lee et al, 2009).…”
Section: Discussionsupporting
confidence: 91%
“…In civil engineering projects, it is common to develop designs in phases and from abstract levels to detailed levels of design (Dinh and Dinh, 2021;Khan et al, 2021;Zaneldin, 2016). Although the phases and levels of design detail are not strictly demarcated and vary across countries and projects, the basic principle of working stepwise from coarse to fine remains similar.…”
Section: Levels Of Design Responsibility To Sub-contractmentioning
confidence: 99%
“…Buildings which uses less water, optimise energy efficiency, conserve natural resources, generate less waste and provide healthier spaces for occupants, as compared to conventional buildings are called green buildings (Hedaoo and Khese, 2016;Khan et al, 2021). In other words, it is a design concept that reduces environmental impact of buildings through innovative land use, construction strategies and appropriate site selection.…”
Section: Introductionmentioning
confidence: 99%
“…In other words, it is a design concept that reduces environmental impact of buildings through innovative land use, construction strategies and appropriate site selection. A specified professional have to assess these design concepts for the building to be green or sustainable (Khan et al, 2021;Koranteng et al, 2021). To have proper building design, construction and operation, several countries have moved forward to establish rating systems.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation