Prospects of Applying MWD Technology for Quality Management of Drilling and Blasting Operations at Mining Enterprises

Abstract: This paper presents a review of measurement while drilling (MWD) technology as applied to the mining industry, describes its development path, provides a global review of literature on this topic, and outlines further trends of development for research on MWD application in drilling and blasting (D&B) operations at mining enterprises. The current review serves as a starting point for anyone interested in the research or application of MWD technology in Mining and Construction. In the paper, the authors exa… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0
3

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 23 publications
(18 citation statements)
references
References 43 publications
(85 reference statements)
0
15
0
3
Order By: Relevance
“…• E v = 112 − 148J∕cm 3 is the drilling specific energy which depends on rock type and was estimated based on a unified classification system of rocks according to their drillability [61]; • drill = 80% is the assumed driller efficiency; • m b is the mass of the block in tonnes.…”
Section: Discussionmentioning
confidence: 99%
“…• E v = 112 − 148J∕cm 3 is the drilling specific energy which depends on rock type and was estimated based on a unified classification system of rocks according to their drillability [61]; • drill = 80% is the assumed driller efficiency; • m b is the mass of the block in tonnes.…”
Section: Discussionmentioning
confidence: 99%
“…Table 30 shows that the sequence of the comprehensive quality index of tunnel smooth blasting of the seven designed schemes is as follows: scheme 6 < scheme 7 < scheme 2 < scheme 4 < scheme 1 < scheme 3 < scheme 5, and the corresponding comprehensive quality index is successively as follows: 4:6670 < 4:6761 < 5:6525 < 5:9687 < 6:0994 < 6:4114 < 6:8001. The evaluation levels of schemes 2, 6, and 7 are intermediate, and the evaluation levels of the other three 18 Geofluids schemes are lower. Therefore, scheme 6 is the optimal scheme, which can be used as the recommended control parameters, that is, the neighboring eyes spacing is down-adjusted by 20%, the minimum resistance line is down-adjusted by 15%, and the linear charge density is down-adjusted by 1%.…”
Section: Resultsmentioning
confidence: 96%
“…However, the proposed control index does not form a system, the actual smooth blasting control process is greatly influenced by human subjectivity, and the accuracy and reliability of the control is poor. Numerous domestic scholars have also conducted extensive research on the tunnel smooth blasting quality control, which mainly involves the repeated test and optimization of blasting parameters [1][2][3][4][5][6][7][8][9][10][11][12], neural network models [13,14], mutation comprehensive evaluation theory [15], computer simulation [16,17], information construction [18,19], three-dimensional laser scanning [20], and other technologies, thereby proposing a reasonable control technology. However, no unified system exists for studying the tunnel smooth blasting control index, control criterion, and control method.…”
Section: Introductionmentioning
confidence: 99%
“…При взрыве заряда ВВ нагрузка на окружающую породу прикладывается мгновенно, а снижается медленно, по мере падения давления с уходом газообразных продуктов взрыва из зарядной полости в процессе растрескивания окружающей породы. Вследствие этого по породному массиву вслед за ударной волной распространяется волна разряжения на значительно большую глубину, чем волна сжатия [8][9][10][11][12].…”
Section: методика определения предельных радиусовunclassified