2018
DOI: 10.21877/2448-3877.201800701
|View full text |Cite
|
Sign up to set email alerts
|

Project of quality management implementation based on the PALC standard and ONA methodology in a clinical analysis laboratory

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The last phase, in turn, begins with a quantitative and/or qualitative result obtained after analysis by a specialized clinician and ends with the delivery of the report. At some stage within these described phases, it is possible that errors in laboratory quality control, direct assistance to management, jeopardize the analysis of the collected material and consequently make it impossible to issue a reliable and accurate report (Barbosa & Mansour, 2019).…”
Section: Introductionmentioning
confidence: 99%
“…The last phase, in turn, begins with a quantitative and/or qualitative result obtained after analysis by a specialized clinician and ends with the delivery of the report. At some stage within these described phases, it is possible that errors in laboratory quality control, direct assistance to management, jeopardize the analysis of the collected material and consequently make it impossible to issue a reliable and accurate report (Barbosa & Mansour, 2019).…”
Section: Introductionmentioning
confidence: 99%