Project Delivery System Selection with Interval-Valued Intuitionistic Fuzzy Set Group Decision-Making Method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 30 publications
(20 citation statements)
references
References 52 publications
0
14
0
Order By: Relevance
“…Akcay and Manisali [46] proposed a fuzzy support system for evaluating contractors, where the DMs ratings are captured using fuzzy linguistic values. An et al [47] applied an interval-value intuitionistic fuzzy set to represent uncertainty in the project delivery system, in which DM weights are estimated using information utility level in project delivery system selection. Tomczak and Jaśkowski [48] applied type-2 interval fuzzy sets in evaluating the qualification of a contractor.…”
Section: Contractor Selectionmentioning
confidence: 99%
See 1 more Smart Citation
“…Akcay and Manisali [46] proposed a fuzzy support system for evaluating contractors, where the DMs ratings are captured using fuzzy linguistic values. An et al [47] applied an interval-value intuitionistic fuzzy set to represent uncertainty in the project delivery system, in which DM weights are estimated using information utility level in project delivery system selection. Tomczak and Jaśkowski [48] applied type-2 interval fuzzy sets in evaluating the qualification of a contractor.…”
Section: Contractor Selectionmentioning
confidence: 99%
“…Energy Efficiency (C 6-1 ) of the solar panel and other equipment is rated. Installation Cost and Impact on the Grid (C 6-2 ) [45,47,76,87] evaluates the extent to which the contractor solution would be able to significantly reduce access to the electricity network or having the ability to supply excess energy to the grid. Operation and Maintenance Optimization (C 6-3 ) evaluates the bidder's description of their organized activities that require a number of workers to make sure the installed solar panel is up and running in the best way possible.…”
Section: Clean Power (C 6 )mentioning
confidence: 99%
“…Similarly, two other measures, Y 2 A * , A j and Y 3 A * , A j , can be obtained by applying Equations (3) and (4).…”
Section: Then the Established Interval Neutrosophic Decision Matrix Imentioning
confidence: 99%
“…The most common PPMs in the construction industry include Design Bid Build (DBB), Design Build (DB), Construction Management (CM), Engineering Procurement Construction (EPC), construction management as program management (CM) [4,5], and Public Private Partnership (PPP) [6,7]. Each form of PPM is unique and cannot be effectively applied to all projects because of their different characteristics [4,8]. To determine the sustainability of a construction project, selecting an appropriate PPM is a key task for owners [1,2].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation