Progress in conceptual design of EU DEMO EC system

Abstract: Abstract.Since 2014 under the umbrella of EUROfusion Consortium the Work Package Heating and Current Drive (WPHCD) is performing the engineering design and R&D for the electron cyclotron (EC), ion cyclotron and neutral beam systems of the future fusion power plant DEMO. This presentation covers the activities performed in the last two years on the EC system conceptual design, as part of the WPHCD, focusing on launchers, transmission lines, system reliability and architecture.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
6

Relationship

3
3

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 7 publications
0
5
0
Order By: Relevance
“…At present 4 ports are dedicated to the ECS, with a total of 8 clusters connected. The reliability analysis [10] led to an optimized number of 6 clusters in operation and 2 in standby for reliability. The system architecture now under study foresees 16 gyrotrons connected to each port and 22 antennas per port (6 for NTM control and 16 for bulk heating).…”
Section: System Descriptionmentioning
confidence: 99%
“…At present 4 ports are dedicated to the ECS, with a total of 8 clusters connected. The reliability analysis [10] led to an optimized number of 6 clusters in operation and 2 in standby for reliability. The system architecture now under study foresees 16 gyrotrons connected to each port and 22 antennas per port (6 for NTM control and 16 for bulk heating).…”
Section: System Descriptionmentioning
confidence: 99%
“…The principle layout is shown in Fig 8 right, θ is the incidence angle, α is the poloidal and β is the toroidal angle (definition cf. [28]). Considering that ρt = 0.6 (q = 3/2) and ρt = 0.77 (q = 2) are reached with different injection angles α = 16.8°, β = 16.5° (q = 2) and α = 22.5°, β = 16.5° (q = 3/2) the value of θ will be around 53°.…”
Section: Ec Beam Opticsmentioning
confidence: 99%
“…The EU DEMO pulse length being 2 h, 1000 pulses between two (major) faults of EC system lead to 2000 h for the MTBF, which is equivalent to 99.9% of reliability. The analysis [33] allowed the selection of proper optimized number of elements of each cluster (n = 8) and the total number of cluster: 4 + 1 for main tasks and one for NTM stabilization. The chosen values are the result of an optimization processes that minimize the total number of gyrotrons/elements and maximize the number of beams on each mirror ensuring the highest possible MTBF [32].…”
Section: Ec System Conceptual Designmentioning
confidence: 99%