2022
DOI: 10.1007/978-3-030-96299-9_12
|View full text |Cite
|
Sign up to set email alerts
|

Production Scheduling Using Multi-objective Optimization and Cluster Approaches

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
0
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(11 citation statements)
references
References 11 publications
0
0
0
Order By: Relevance
“…In this section, a framework about GRM is put forward, which hereafter will be named as collaborative management (CM), in the I4.0 context, and which resulted from the SLR carried out, in addition to the co-authors' own knowledge in the focused scientific domain, as can be seen, for instance, in [18][19][20][21]29,32,40,[62][63][64][65].…”
Section: Proposed Collaborative Frameworkmentioning
confidence: 99%
See 2 more Smart Citations
“…In this section, a framework about GRM is put forward, which hereafter will be named as collaborative management (CM), in the I4.0 context, and which resulted from the SLR carried out, in addition to the co-authors' own knowledge in the focused scientific domain, as can be seen, for instance, in [18][19][20][21]29,32,40,[62][63][64][65].…”
Section: Proposed Collaborative Frameworkmentioning
confidence: 99%
“…Thus, it turns out to be imperative to make use of appropriate decision support (DS) approaches and tools, which, enable dynamic and agile DS, namely through the use of multicriteria decision making (MCDM) methods and models [15], along with intelligent and/or predictive DS algorithms and systems [18,19], besides other approaches and technologies, for instance to permit parallel programming [20]. This last one can further benefit from different kind of I4.0 technology, namely from the use of high-performance computing (HPC) [20].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…The accomplishment this widened set of approaches, methods, tools, systems, and platforms implies the use of appropriate CollM&M paradigms, which are related to dynamic, distributed, integrated, intelligent/predictive, parallel, and real-time-based contributions [6,[24][25][26][27][28].…”
mentioning
confidence: 99%
“…Moreover, CollM&M has to ensure the fulfillment of an appropriate set of varying objectives or performance measures, which include companies' internal and external goals, and are frequently contradicting, thus further requiring the application of multicriteria and/or multiobjective and intelligent optimization methods, along with data acquisition, normalization techniques, and tools, to enable further incomplete and uncertain data processing, visualization, and analysis [2,5,13,25,29].…”
mentioning
confidence: 99%