2015
DOI: 10.1049/iet-gtd.2014.0669
|View full text |Cite
|
Sign up to set email alerts
|

Probabilistic harmonic load flow using fast point estimate method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 37 publications
(8 citation statements)
references
References 25 publications
0
8
0
Order By: Relevance
“…The harmonic remains stochastically volatile under certain stable working conditions in practice while it also may reflect rhythmic/regular changes along with time, operation parameters or other potential possible factors from the perspective of probability [6]. These characteristics are measured and observed throughout TPSS and make it quite a complex challenge for describing the dynamic harmonic phenomena with one analytic model.…”
Section: A Current Problemsmentioning
confidence: 99%
“…The harmonic remains stochastically volatile under certain stable working conditions in practice while it also may reflect rhythmic/regular changes along with time, operation parameters or other potential possible factors from the perspective of probability [6]. These characteristics are measured and observed throughout TPSS and make it quite a complex challenge for describing the dynamic harmonic phenomena with one analytic model.…”
Section: A Current Problemsmentioning
confidence: 99%
“…On one hand, neglecting harmonics in the capacitor placement problem causes errors in the calculation. On the other hand, lack of proper modeling of nonlinear loads and inappropriate selection of the place and size of capacitor banks can cause more problems in the power quality of the power system by generating resonances at harmonic frequencies between capacitors and multiple inductors installed in the system [2,[8][9][10].…”
Section: Introductionmentioning
confidence: 99%
“…Since the early seventies that the uncertainty in demand was first considered, the PPF methods has been proposed [13]. Based on the strategy of solving PPF problem, these methods are essentially classified into three main categories: simulation [14][15][16], approximate [17][18][19][20][21] and analytical methods [22][23][24]. Monte Carlo simulation is commonly known as a systemdimension independent method (MCS) that can provide accurate results.…”
Section: Introductionmentioning
confidence: 99%
“…Although this method is straight-forward and can be applied to the systems with correlations, it cannot cope with distribution systems and microgrids, efficiently and may have some hardships in systems with high number of correlations. Generally, point estimate method (PEM) [17,18], and its derivatives such as two-point estimate method (2PEM) [19], 2n + 1 PEM [20] and fast point estimate method (FPEM) [21] are all computationally rapid and are simply applied to PPF problem using the knowledge of first few statistical moments of inputs [19]. However, PEMs do not provide the PDF for the results, and they hold a low accuracy to provide higher statistical moments.…”
Section: Introductionmentioning
confidence: 99%