2011
DOI: 10.1016/j.sbspro.2011.04.424
|View full text |Cite
|
Sign up to set email alerts
|

Proactive Ramp Management under the Threat of Freeway-Flow Breakdown

Abstract: Procedia - Social and Behavioral Sciences 16 (2011) 4-14. doi:10.1016/j.sbspro.2011.04.424Received by publisher: 0000-01-01Harvest Date: 2016-01-04 12:23:45DOI: 10.1016/j.sbspro.2011.04.424Page Range: 4-1

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
32
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 28 publications
(33 citation statements)
references
References 7 publications
1
32
0
Order By: Relevance
“…When it occurs, it can occur at different times. This stochastic nature of capacity has received a great amount of interest and attention among researchers in two areas: 1) its impacts on a freeway's capacity assumptions (Geistefeldt, 2008;Elefteriadou et al, 2003), and 2) finding the probability of breakdown occurrence based on upstream traffic conditions such as traffic flow, occupancy or combinations of the variables (Elefteriadou et al, 1995, Kondyli, 2011 It is interesting to compare the real-world stochasticity mentioned above with the stochasticity of simulation models, described next. Stochastic simulation models produce different results for simulation runs with the same inputs, but different seed numbers.…”
Section: Breakdown Characteristics Calibrationmentioning
confidence: 99%
“…When it occurs, it can occur at different times. This stochastic nature of capacity has received a great amount of interest and attention among researchers in two areas: 1) its impacts on a freeway's capacity assumptions (Geistefeldt, 2008;Elefteriadou et al, 2003), and 2) finding the probability of breakdown occurrence based on upstream traffic conditions such as traffic flow, occupancy or combinations of the variables (Elefteriadou et al, 1995, Kondyli, 2011 It is interesting to compare the real-world stochasticity mentioned above with the stochasticity of simulation models, described next. Stochastic simulation models produce different results for simulation runs with the same inputs, but different seed numbers.…”
Section: Breakdown Characteristics Calibrationmentioning
confidence: 99%
“…Report 3-87 suggests improving this algorithm by including the probability of breakdown for the activation and/or metering rate calculation (Elefteriadou et al, 2009). This means that the ramp metering rate is set to keep the demand significantly lower than the capacity, as is done with the simple demand-capacity algorithm.…”
Section: Demand-capacity Algorithmmentioning
confidence: 99%
“…MALINEA measures upstream occupancy of the freeway segment and the time lag between upstream and downstream measurements in order to incorporate the upstream conditions in the metering rate calculation. MALINEA uses the following equation (Elefteriadou et al, 2009):…”
Section: Malineamentioning
confidence: 99%
See 2 more Smart Citations