Preparing a framework for two-stage target-cost arrangement formulation

Abstract: Purpose – Early involvement of the project team with the construction resources seems to be gaining popularity as it aims to improve the cost efficiency of a project as there is significantly more potential to influence the project solution at that point in time. The missing price during early involvement/selection and the principal-agent setting, however, tend to leave the project owner in doubt of the reasonableness of pricing when it is fixed only later after the joint design phase involving… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
19
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 15 publications
(20 citation statements)
references
References 60 publications
(82 reference statements)
1
19
0
Order By: Relevance
“…The work was, however, only suggestive and argumentative and made no real attempt at detailed formulation and testing of the hypothetical model against practical risks and cost realities of construction projects. That is why Lahdenperä (2016) delved into the topic in more detail in order to produce a rigorous framework for developing and assessing alternative formulations of a 2STC model as to proper functioning and instantiation. The framework incorporates numerous criteria to ensure functioning and a suggested path to instantiation.…”
Section: Formularisingmentioning
confidence: 99%
See 2 more Smart Citations
“…The work was, however, only suggestive and argumentative and made no real attempt at detailed formulation and testing of the hypothetical model against practical risks and cost realities of construction projects. That is why Lahdenperä (2016) delved into the topic in more detail in order to produce a rigorous framework for developing and assessing alternative formulations of a 2STC model as to proper functioning and instantiation. The framework incorporates numerous criteria to ensure functioning and a suggested path to instantiation.…”
Section: Formularisingmentioning
confidence: 99%
“…The previous section revisited the idea of a potentially better target-cost arrangement without providing any proof that such a solution would not also be biased. That is why Lahdenperä (2016) reviewed critically the approach and specified general criteria for rigorous assessment of potential solutions. The criteria are summarised in Table I and the model formulations generated below are to be assessed against them.…”
Section: Requirement Framework For a 2stc Formulationmentioning
confidence: 99%
See 1 more Smart Citation
“…The development towards more complex projects demands, however, alternative (evolving) project delivery methods to ensure appropriate project delivery, contract compliance and quality assurance (Molenaar et al, 2007). One of the evolving approaches is early contractor involvement (ECI) (Lahdenperä, 2016;Molenaar et al, 2007;Manley and Chen, 2017). ECI facilitates implementation of innovative, efficient and value-adding solutions through building trust-based cooperation between clients and contractors (Ozorhon, 2013;Ozorhon et al, 2014;Ozorhon et al, 2015;Wondimu et al, 2018c).…”
Section: Introductionmentioning
confidence: 99%
“…However, the growth of increasingly more complex projects demands alternative (evolving) project delivery methods to ensure appropriate project delivery, contract compliance, and quality assurance (Molenaar et al , 2007). One of the evolving approaches is ECI (Lahdenperä, 2016; Molenaar et al , 2007).…”
Section: Introductionmentioning
confidence: 99%