Formularising two-stage target-cost arrangements for use in practice

Abstract: Purpose – Early involvement of the project team with the construction resources seems to be gaining popularity as it aims to improve the cost efficiency of a project as there is significantly more potential to influence the project solution at that point in time. The missing price during early involvement/selection and the principal-agent setting, however, tend to leave the project owner in doubt of the reasonableness of pricing when it is fixed only later after the joint design phase involving… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 11 publications
(23 reference statements)
0
3
0
Order By: Relevance
“…The work on model formulation in its entirety is examined in two articles. The one at hand focuses on theory connections and requirement determination as an initial step while model formulation and testing in accordance with set guidelines is presented in a companion article (Lahdenperä, 2016). As to the mechanistic functioning of the model, the guidelines for model formulation consist of the following key (intrinsic) criteria:…”
Section: Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…The work on model formulation in its entirety is examined in two articles. The one at hand focuses on theory connections and requirement determination as an initial step while model formulation and testing in accordance with set guidelines is presented in a companion article (Lahdenperä, 2016). As to the mechanistic functioning of the model, the guidelines for model formulation consist of the following key (intrinsic) criteria:…”
Section: Discussionmentioning
confidence: 99%
“…Hevner, 2007), which applies to the evolution of the 2STC model as presented here. Correspondingly, the interplay between requirement setting, testing and review (to the extent carried out) extends beyond the paper at hand and includes also the emergence of a companion article as Lahdenperä (2016). As to methodology, the paper at hand is largely based on conceptual analysis while the other one emphasises mathematical modelling and optimisation in order to illustrate the key features and functioning of the model.…”
Section: Framework For 2stc Arrangement Formulationmentioning
confidence: 99%
See 1 more Smart Citation