Preliminary design of EU DEMO helium-cooled breeding blanket primary heat transfer system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
7
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 20 publications
(16 citation statements)
references
References 14 publications
0
7
0
Order By: Relevance
“…One of the most promising BB concepts, which is extensively studied in Europe is the so-called Helium Cooled Pebble Bed (HCPB). The HCPB consists of 6 Li enriched pebbles for tritium breeding, Be as neutron multiplier,…”
mentioning
confidence: 99%
“…One of the most promising BB concepts, which is extensively studied in Europe is the so-called Helium Cooled Pebble Bed (HCPB). The HCPB consists of 6 Li enriched pebbles for tritium breeding, Be as neutron multiplier,…”
mentioning
confidence: 99%
“…KDII/5-Considerations related to the characteristics of the BoP play an important role in the design and the licencing of the DEMO plant. Emphasis at this early design phase has been on a few important aspects of BoP, par ticularly the PHTS [31,32] and the relevant power conversion system (PCS) [33] because of their technical complexity and strong impact on design integration, maintenance and safety [34]. The pulsed operation foreseen for DEMO is particularly demanding for the plant electrical system (PES), BoP and PCS.…”
Section: Key Design Integration Issuesmentioning
confidence: 99%
“…The heat produced by the plasma fusion must be transferred to Power Conversion System (PCS) able to transform it into electrical energy with maximum possible efficiency and reliability: this is the main scope of the BoP. In the present status of the DEMO project, two alternative solutions are considered as basic fluid to cool down the BB: water and helium [8,13,14]. Consequently, two options are considered for the Primary Heat Transfer System (PHTS):…”
mentioning
confidence: 99%
“…In order to reduce the output power fluctuations, an intermediate buffer system could be inserted between the PHTS and the PCS. Therefore, two different approaches are under evaluation about the PHTS-PCS coupling [13,14] for both the two cooling options: The thermal efficiency in the direct cycle option is higher but the TG's life cycle is compromised because it is turned on only during the burn flat-top phase. The thermal energy is extracted from the BB by water or helium, then it is transferred to steam supplying the steam turbine.…”