Prediction of the number of consumed disc cutters of tunnel boring machine using intelligent methods

Abstract: Purpose. Disc cutters are the main cutting tools for the Tunnel Boring Machines (TBMs). Prediction of the number of consumed disc cutters of TBMs is one of the most significant factors in the tunneling projects. Choosing the right model for predicting the number of consumed disc cutters in mechanized tunneling projects has been the most important mechanized tunneling topics in recent years. Methods. In this research, the prediction of the number of consumed disc cutters considering machine and ground co… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 30 publications
0
3
0
Order By: Relevance
“…Choosing the right model for operating and maintaining the equipment not only determines the tunnel construction schedule, but also directly affects the safety of personnel at the construction site. Equipment risks include failure of the pipe assembly, failure of the jacking system, failure of the grouting system, mismatch of the operation model selection, consumption of disc cutters, and failure of the shield tail seal [1,7,13].…”
Section: Equipment Riskmentioning
confidence: 99%
See 2 more Smart Citations
“…Choosing the right model for operating and maintaining the equipment not only determines the tunnel construction schedule, but also directly affects the safety of personnel at the construction site. Equipment risks include failure of the pipe assembly, failure of the jacking system, failure of the grouting system, mismatch of the operation model selection, consumption of disc cutters, and failure of the shield tail seal [1,7,13].…”
Section: Equipment Riskmentioning
confidence: 99%
“…The total deviation of first-level indicators is shown in Table 6. Step 3: calculate the objective weight of TBM tunnel construction risk based on maximum deviation according to Formula (13). The first-level index weight λ 1i is shown in Table 7.…”
Section: Subjective Weightmentioning
confidence: 99%
See 1 more Smart Citation
“…This process is not only time-consuming but also demands significant attention and expertise from operators, particularly when constructing long and large tunnels, where maintaining optimal operation becomes increasingly complex. Furthermore, the complexity of TBM excavation poses significant risks, including working in environments without natural light, the possibility of falling tunnel walls, exposure to various air pollutants, and the risks of explosion and fire, which can lead to irreparable accidents if not properly managed 8 , 9 . The high uncertainty in ground conditions and limited space further exacerbate these risks.…”
Section: Introductionmentioning