2022
DOI: 10.1007/s00603-022-02782-2
|View full text |Cite
|
Sign up to set email alerts
|

Prediction of TBM Advance Rate Considering Geotechnical and Operating Risks: An Example of the Lanzhou Long Water Conveyance Tunnel, China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(4 citation statements)
references
References 28 publications
0
3
0
Order By: Relevance
“…Consequently, a grinding effect occurs between the disc cutter and the rock, resulting in increased powdery rock chip content, smaller rock chip particle sizes, an elevated SE, and a reduced CI. Therefore, the rock-breaking efficiency of the TBM decreases [31], as illustrated in Figure 9c. During this period, penetration is minimal, resulting in limited rock-breaking and slower tunneling progress, which is not conducive to efficient tunneling.…”
Section: Correlation Between Rock-breaking Efficiency and Tunneling P...mentioning
confidence: 91%
“…Consequently, a grinding effect occurs between the disc cutter and the rock, resulting in increased powdery rock chip content, smaller rock chip particle sizes, an elevated SE, and a reduced CI. Therefore, the rock-breaking efficiency of the TBM decreases [31], as illustrated in Figure 9c. During this period, penetration is minimal, resulting in limited rock-breaking and slower tunneling progress, which is not conducive to efficient tunneling.…”
Section: Correlation Between Rock-breaking Efficiency and Tunneling P...mentioning
confidence: 91%
“…Complexity will greatly increase with the length of tunnel which passes through different geological structures, especially unfavorable geological sections including fracture collapse zones, water inrush, and unstable surrounding rock [4,6]. This correspondingly increases the geological risk of tunnel construction with a selected TBM [11,31]. Due to the uncertainty of hydrogeological environments during construction, a TBM is prone to various geological hazards when digging in poor geological sections, which affects the construction progress.…”
Section: Geological Riskmentioning
confidence: 99%
“…Therefore, along with the construction of numbers of long-distance inter-basin water conveyance projects, shield technology has been more and more widely applied in China, and corresponding specifications have been formulated [7][8][9]. However, due to the complexity and variable geological conditions faced by inter-basin water conveyance projects and the limited practice of TBM technology in this area of China, the safety of a TBM tunnel construction is still a prominent problem [10,11]. This is a reminder that theoretical exploration and engineering practice are significant for the evaluation and control of safety-risk in TBM tunnel construction.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation