“…However, activities have progressed at a considerably faster rate than had been predicted just a couple of years ago, with a total of 220 P2X research and demonstration projects in Europe either been realized, completed, or currently being planned as of June 2020 [10]. Nevertheless, technical aspects, like the utilization of intermittent renewable resources and the degradation processes [11], as well as non-technical aspects, like regulatory frameworks [12], lack of market formation [13], social acceptance, current prices and lack of comprehensive life-cycle assessment (LCA), challenge the introduction of P2X [14] Figure 1 illustrates a keyword analysis on Scopus, showing a significant increase of publications about the topic "Power-to-X" in recent years, indicating that this concept is indeed discussed in the scientific literature. However, there still exists a knowledge gap concerning SWOT factors, as none of the publications included in the review have looked into this specific topic.…”