2009 IEEE Power &Amp; Energy Society General Meeting 2009
DOI: 10.1109/pes.2009.5275942
|View full text |Cite
|
Sign up to set email alerts
|

Power system risk assessment using a hybrid method of fuzzy set and Monte Carlo simulation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
73
0

Year Published

2012
2012
2019
2019

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 41 publications
(73 citation statements)
references
References 0 publications
0
73
0
Order By: Relevance
“…A new approach to incorporate the fuzzy load model in system reliability assessment has been presented in [22]. Reference [10] presented a method that combines fuzzy and probabilistic techniques. A fuzzy membership function with a probabilistic mean value is developed to model outage parameters, whereas a fuzzy representation for the peak load with the probability distribution for a load curve is developed to model the system load.…”
Section: Fuzzy Set Applications In Faulted Power Systemsmentioning
confidence: 99%
See 3 more Smart Citations
“…A new approach to incorporate the fuzzy load model in system reliability assessment has been presented in [22]. Reference [10] presented a method that combines fuzzy and probabilistic techniques. A fuzzy membership function with a probabilistic mean value is developed to model outage parameters, whereas a fuzzy representation for the peak load with the probability distribution for a load curve is developed to model the system load.…”
Section: Fuzzy Set Applications In Faulted Power Systemsmentioning
confidence: 99%
“…A triangle membership function of repair time (hours per failure) can be easily created with the point and interval estimates [10,23], as can be seen in Fig. 1.…”
Section: Fuzzy Modeling Of Repair Timementioning
confidence: 99%
See 2 more Smart Citations
“…In [29], a multi objective probabilistic risk index is proposed to capture the likelihood and consequences of events. Fuzzy and Monte Carlo simulation based hybrid technique is proposed in [30] for the assessment of power system risk. Multiobjective optimization based algorithm is presented in [31] for the active distribution network planning, taking into account uncertainties in DG and the demand response.…”
Section: Introductionmentioning
confidence: 99%