2018
DOI: 10.1049/joe.2018.8851
|View full text |Cite
|
Sign up to set email alerts
|

Power gird interconnection with HVDClink in Northeast Asia considering complementarity of renewable energy and time zone difference

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 8 publications
(7 reference statements)
0
2
0
Order By: Relevance
“…While trade potential in Russia and Central Asia has stretched 24.5 billion kWh, African countries reached 31.3 billion kWh, and 11.9 billion kWh in South Asia, 18.4 billion kWh in South East Asia, 1.1 billion kWh in East Asia. South America 46.1 billion kWh and in North America 92.7 billion kWh [34,[109][110][111].…”
Section: Benefits and Ppportunitiesmentioning
confidence: 99%
“…While trade potential in Russia and Central Asia has stretched 24.5 billion kWh, African countries reached 31.3 billion kWh, and 11.9 billion kWh in South Asia, 18.4 billion kWh in South East Asia, 1.1 billion kWh in East Asia. South America 46.1 billion kWh and in North America 92.7 billion kWh [34,[109][110][111].…”
Section: Benefits and Ppportunitiesmentioning
confidence: 99%
“…Therefore, in the European Union (EU), the Nord EU Super grid and Sud EU-Middle East and North Africa (MENA) Super grid projects are being promoted to reduce greenhouse gases and establish a single electricity market [1][2][3][4]. In addition, in Northeast Asia, the Northeast Asia Power System Interconnection (NAPSI) project is being planned to establish a strategy for linking power systems between Korea, Japan, China, Russia, and Mongolia [5][6][7].…”
Section: Introductionmentioning
confidence: 99%