2020
DOI: 10.1088/1757-899x/722/1/012004
|View full text |Cite
|
Sign up to set email alerts
|

Platelet Inventory Management System Using Monte Carlo Simulation

Abstract: Improper of blood management will lead to wastage due to the nature of blood that is not durable and easily damaged, so if the blood is stored too much and not used until the expired date, the blood will be damaged. Platelet components have a limited lifetime for 5 days. With a short blood age, every month there will be two possibilities, one is shortage of blood inventory (stockout) or two, over blood inventory (overstock) in the storage area. From the data obtained, the expired rate in 2017 reached 743 blood… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…Blood availability can be overcome by paying attention to the applied inventory method. Due to the nature of blood, which is very high in uncertainty, certain methods are needed to accommodate the required amount of healthy blood, such as Discrete Event Simulation [24] and Monte Carlo Simulation [25].…”
Section: Analysis Of Determination Of Potential Root Causes Of Low Bl...mentioning
confidence: 99%
“…Blood availability can be overcome by paying attention to the applied inventory method. Due to the nature of blood, which is very high in uncertainty, certain methods are needed to accommodate the required amount of healthy blood, such as Discrete Event Simulation [24] and Monte Carlo Simulation [25].…”
Section: Analysis Of Determination Of Potential Root Causes Of Low Bl...mentioning
confidence: 99%
“…This optimization was made using a mathematical programming approach that focuses on the problem of storage locations and strategic decision-making [11]. Proposed a dynamic programming approach for platelet production [12]. Proposed integer programming and variable search techniques to evaluate the change from a vendor-managed inventory system to a new system for the Austrian Red Cross [13].…”
Section: Related Workmentioning
confidence: 99%