2009
DOI: 10.1016/j.fusengdes.2008.12.082
|View full text |Cite
|
Sign up to set email alerts
|

Plasma control system for “Day-One” operation of KSTAR tokamak

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2009
2009
2016
2016

Publication Types

Select...
8
1

Relationship

3
6

Authors

Journals

citations
Cited by 43 publications
(11 citation statements)
references
References 14 publications
0
11
0
Order By: Relevance
“…Density feedback implementation was done since the first year [3] based on the line-averaged electron density diagnostics [16], but has not been utilized very often because of (1) uncertainties on the measurement in the plasmas with large ELM crashes, and (2) low fuelling efficiency of the outboard gas [17]. Several minor improvements on the density measurement was done, and research seeking for better efficiency introduced additional PID by Supersonic Molecular Beam Injections (SMBI) [18].…”
Section: Progress On Kinetic Controlsmentioning
confidence: 99%
See 1 more Smart Citation
“…Density feedback implementation was done since the first year [3] based on the line-averaged electron density diagnostics [16], but has not been utilized very often because of (1) uncertainties on the measurement in the plasmas with large ELM crashes, and (2) low fuelling efficiency of the outboard gas [17]. Several minor improvements on the density measurement was done, and research seeking for better efficiency introduced additional PID by Supersonic Molecular Beam Injections (SMBI) [18].…”
Section: Progress On Kinetic Controlsmentioning
confidence: 99%
“…Starting from a single-process version in 2008 [3], with adaptation of the General Atomics Plasma Control System software, extensive upgrades are done through the previous 7 successive campaigns in order to achieve annual goals of KSTAR performance enhancement.…”
Section: Introductionmentioning
confidence: 99%
“…KSTAR PCS derived from the DIII-D PCS [4]. It does not have EPICS interface and cannot be accessed during the plasma control period.…”
Section: System Inter-connectionmentioning
confidence: 99%
“…Since the prior step continues until any next steps are completed, a kind of massive integration method for very long period was required. Even the plasma control system [5], which was supposed to have very short operating time compared to the overall operation schedule, had structures and procedures for reacting any disturbances on the status of the superconducting systems.…”
Section: Design Of the Shape Control Systemmentioning
confidence: 99%