2018
DOI: 10.1016/j.solener.2018.03.016
|View full text |Cite
|
Sign up to set email alerts
|

Photovoltaic farm impact on parameters of power quality and the current legislation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

3
11
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(15 citation statements)
references
References 13 publications
3
11
0
Order By: Relevance
“…Pinto et al [16] presented results of a PQ analysis for a PV system connected to an LV rural network; the voltage at the PCC increased and remained very close to the allowable limit. Similarly, Grycan et al [18] reported that an increase in the PV power injection from a solar farm caused an increase in Vrms at the PCC and a decrease in voltage distortion.…”
Section: Introductionmentioning
confidence: 89%
See 3 more Smart Citations
“…Pinto et al [16] presented results of a PQ analysis for a PV system connected to an LV rural network; the voltage at the PCC increased and remained very close to the allowable limit. Similarly, Grycan et al [18] reported that an increase in the PV power injection from a solar farm caused an increase in Vrms at the PCC and a decrease in voltage distortion.…”
Section: Introductionmentioning
confidence: 89%
“…Table 1 lists some of these studies; several of them include THD/IHD analysis through on-site measurements during several time periods. PV system integration in low-voltage (LV) and medium-voltage (MV) networks can increase the Vrms and decrease the THDV at the PCC [9][10][11][16][17][18][19]21]; this effect seems to be more noticeable for higher PV power injections.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…It indicates to the changeability of the parameter in accordance with one-phase PV subsystems power production. The analysis of the University PV installation PQ level are made separately for each parameter in accordance to LV level demands of the standards and regulations [15].…”
Section: Evaluation Of Pv System Working In Pccmentioning
confidence: 99%