All Days 2009
DOI: 10.2523/iptc-13967-ms
|View full text |Cite
|
Sign up to set email alerts
|

Permanent Downhole Cable to Surface Gauges Technology and Real-time Monitoring System Optimizes Artificial Lift Wells Production Operations, B-Field Sultanate of Oman Case Study

Abstract: TX 75083-3836, U.S.A., fax +1-972-952-9435. AbstractThe principal considerations in designing a permanent gauge system are the accuracy, resolution and stability of the acquired data (pressure, temperature, flow) and the reliability with which this data can be transmitted to the end user. Cable to Surface gauges combined with the ISU, or ISP Unit can immediately satisfy metrological requirements for pressure and temperature data acquisition in real-time.Set against the industry demand, especially during the ec… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance