2019
DOI: 10.1080/01446193.2019.1616789
|View full text |Cite
|
Sign up to set email alerts
|

Performance-based control of variability and tolerance in off-site manufacture and assembly: optimization of penalty on poor production quality

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
25
0
3

Year Published

2019
2019
2024
2024

Publication Types

Select...
9
1

Relationship

0
10

Authors

Journals

citations
Cited by 52 publications
(28 citation statements)
references
References 85 publications
0
25
0
3
Order By: Relevance
“…With the sudden increase of interest in off-site construction-prefabrication-in many countries [101], increasing the prefabrication rate of precast concrete structures, automation of the assembly sequence and planning, and optimization must be topics important on the agenda within the domain of structural engineering [102]. With BIM in mind, future studies can target the unique characteristics of cast-in-place concrete in developing future versions of IFC, overlapping of structural elements, use of reinforcement bars, and the need for precision in loads and material considerations [103].…”
Section: Gaps and Future Areas For Researchmentioning
confidence: 99%
“…With the sudden increase of interest in off-site construction-prefabrication-in many countries [101], increasing the prefabrication rate of precast concrete structures, automation of the assembly sequence and planning, and optimization must be topics important on the agenda within the domain of structural engineering [102]. With BIM in mind, future studies can target the unique characteristics of cast-in-place concrete in developing future versions of IFC, overlapping of structural elements, use of reinforcement bars, and the need for precision in loads and material considerations [103].…”
Section: Gaps and Future Areas For Researchmentioning
confidence: 99%
“…The inaccuracy of measurement devices may be considerable relative to allowable deviations of structures and components that are connected to the structures. Conventional instruments heavily rely on sampling techniques, making the results prone to the risk of being inaccurate (Arashpour et al 2020;Phares et al 2004). The challenge with the application of recently developed measurement instruments (e.g., terrestrial laser scanner) is their high cost (Puri et al 2018) and a lack of adequate research on how to best utilize their level of accuracy (Rebolj et al 2017).…”
Section: Causes Of Tolerance Issues In Constructionmentioning
confidence: 99%
“…In this research, the virtual pre-splicing of two steel beams using TLS was carried out for Fujiang Bridge in Tongnan, China. Similarly, Arashpour et al [205] developed a framework for quality control of off-site constructions of structural components, in order to reduce on-site assembly discrepancy. In this effort, the point cloud of the prefabricated components was captured using TLS, and the results were compared with the as-designed geometry condition provided in BIM.…”
Section: Quality Control Management and Operationmentioning
confidence: 99%