2020
DOI: 10.1016/j.ref.2019.11.002
|View full text |Cite
|
Sign up to set email alerts
|

Performance analysis of 954,809 kWp PV array of Sheikh Zayed solar power plant (Nouakchott, Mauritania)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
10
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 35 publications
(18 citation statements)
references
References 13 publications
0
10
0
Order By: Relevance
“…It also provides the option of checking performance, production, seasonal fluctuations, and long‐term degradation 38 . The PR indicates the general effect of losses on the normal energy production of a PV panel depending on its temperature and the incomplete use of the incident solar radiation and the inefficiencies or failures of the system components 36 . The performance rate of a PV solar power plant indicates how close it is to the ideal performance during operation.…”
Section: Resultsmentioning
confidence: 99%
See 3 more Smart Citations
“…It also provides the option of checking performance, production, seasonal fluctuations, and long‐term degradation 38 . The PR indicates the general effect of losses on the normal energy production of a PV panel depending on its temperature and the incomplete use of the incident solar radiation and the inefficiencies or failures of the system components 36 . The performance rate of a PV solar power plant indicates how close it is to the ideal performance during operation.…”
Section: Resultsmentioning
confidence: 99%
“…The “final yield true(Yf)” factor represents the relationship between the energy produced by the PV system and the nominal installed power P 0 (kWp) 36 . This amount represents the number of hours that the PV plant operates at its nominal power 15 .…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…In this study, the interest rate and lifetime were assumed to be equal to 10% and 20 years, respectively. The NPC and cost of energy (COE) are given by ( 7) and (10) [46]:…”
Section: Economic Parametersmentioning
confidence: 99%