2009
DOI: 10.2172/969739
|View full text |Cite
|
Sign up to set email alerts
|

PEP Run Report for Integrated Test A, Caustic Leaching in UFP-VSL-T01A, Oxidative Leaching in UFP-VSL-T02A

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2009
2009
2014
2014

Publication Types

Select...
3

Relationship

2
1

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Testing was conducted to evaluate the caustic leaching process; observations relative to risk of plugging provided secondary -or opportunistic --data. 21,22,23,24 The simulant used in this testing contained boehmite, gibbsite, chromium oxyhydroxide, sodium oxalate, filtration simulant, and supernate. This simulant was selected to investigate caustic leaching, oxidative leaching, and washing.…”
Section: Pep Testsmentioning
confidence: 99%
“…Testing was conducted to evaluate the caustic leaching process; observations relative to risk of plugging provided secondary -or opportunistic --data. 21,22,23,24 The simulant used in this testing contained boehmite, gibbsite, chromium oxyhydroxide, sodium oxalate, filtration simulant, and supernate. This simulant was selected to investigate caustic leaching, oxidative leaching, and washing.…”
Section: Pep Testsmentioning
confidence: 99%
“…Tests used as-prepared PEP simulant slurry developed for Integrated Tests A and B (see Guzman-Leong et al 2009;Geeting et al 2009;). Tests studied long-time fouling dynamics and flux decline by filtering the as-prepared PEP simulant slurry in continuous-recycle filtration (where all permeate collected was immediately and continuously returned to the slurry reservoir) at ~5-wt% undissolved solids (UDS) and at various AV and TMP setpoint combinations.…”
Section: Series 1 Testing: Long-term Fouling Testsmentioning
confidence: 99%
“…As stated in the introduction to this section, all Series 1 filtration tests employed an as-prepared PEP simulant slurry developed for Integrated Tests A and B (see Guzman-Leong et al 2009;Geeting et al 2009;). Supporting documentation for the production and procurement of this simulant can be found in Scheele et al (2009).…”
Section: Waste Simulantmentioning
confidence: 99%