2022
DOI: 10.28989/senatik.v7i0.443
|View full text |Cite
|
Sign up to set email alerts
|

Pengendalian Persediaan Bahan Bakar Solar Menggunakan Model Probabilistik pada SPDN Baji Pamai Maros

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
5
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 2 publications
0
5
0
Order By: Relevance
“…Determining how much raw material inventory will affect company activities. Small inventory will have an impact on production activities because there will be stock outs resulting in delays in meeting consumer demand (Dahlan et al, 2022). Meanwhile, if the inventory is too large it will have an impact on accumulation and excess storage costs.…”
Section: Introductionmentioning
confidence: 99%
“…Determining how much raw material inventory will affect company activities. Small inventory will have an impact on production activities because there will be stock outs resulting in delays in meeting consumer demand (Dahlan et al, 2022). Meanwhile, if the inventory is too large it will have an impact on accumulation and excess storage costs.…”
Section: Introductionmentioning
confidence: 99%
“…Quite a several pharmacies still use human resources to process existing data to facilitate their business [3][4]. The use of computers is very much needed in matters relating to the processing of available drug inventory data, data processing that is a supplier to pharmacies processing employee data at pharmacies with active and inactive status at pharmacies, and also transaction processing without evidence in the form of receipts[5] [6]. at the Ahza Abadi Pharmacy, which is a type of business in the medical field in Makassar where the problem is that activities are still being recorded, be it sales or purchase transactions into a book and recording supplier data and employee data, thus making things easier [7] [8].…”
Section: Introductionmentioning
confidence: 99%
“…As a result, the manufacture of perforated concrete roster products is carried out based on estimates from workers who do not have the right composition and process. This results in a quality that is not in accordance with the standard, in this case the level of strength of the perforated concrete roster product produced still does not meet the standard (SNI) [11]. According to SNI, the roster requirements (perforated concrete brick) must have a compressive strength of around 30 MPa or the equivalent of 350 kg/cm2 [12].…”
Section: Introductionmentioning
confidence: 99%