2016
DOI: 10.1016/j.ijpe.2016.04.007
|View full text |Cite
|
Sign up to set email alerts
|

Peak power demand reduction for combined manufacturing and HVAC system considering heat transfer characteristics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 31 publications
(11 citation statements)
references
References 18 publications
0
9
0
Order By: Relevance
“…The authors of [51] studied the Bernoulli production line to minimize the peak demand cost and labor cost. The authors of [52] considered the heating ventilation and air conditioning system to reduce the peak load of manufacturing system. The authors of [51,52] focused on the tact-system production rather than jobs sequencing, and they considered corrective maintenance for random breakdowns rather than PM.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…The authors of [51] studied the Bernoulli production line to minimize the peak demand cost and labor cost. The authors of [52] considered the heating ventilation and air conditioning system to reduce the peak load of manufacturing system. The authors of [51,52] focused on the tact-system production rather than jobs sequencing, and they considered corrective maintenance for random breakdowns rather than PM.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The authors of [52] considered the heating ventilation and air conditioning system to reduce the peak load of manufacturing system. The authors of [51,52] focused on the tact-system production rather than jobs sequencing, and they considered corrective maintenance for random breakdowns rather than PM. The authors of [53] is the first attempt to tackle the permutation flow shop scheduling problem with peak demand constraint, in which the mixed integer programming formulations are provided to minimize the single objective of makespan.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…Dababneh et al [42] proposed an analytical model on electricity demand response considering a combined manufacturing and HVAC system. The production schedule and HVAC set points were determined by solving the objective functions using General Algebraic Modelling.…”
Section: Previous Related Workmentioning
confidence: 99%
“…Brundage et al [108] utilized the energy opportunity window to shift production schedules around high periods of demand for the HVAC system to reduce overall energy impact of the manufacturing system. Dabahneh et al [109] presented an optimal schedule for manufacturing operation and HVAC temperature to minimize power demand while still meeting production requirements.…”
Section: Studying Phases Of the Sima Reference Architecturementioning
confidence: 99%