Energy Law and Economics 2018
DOI: 10.1007/978-3-319-74636-4_7
|View full text |Cite
|
Sign up to set email alerts
|

Paying for Energy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 21 publications
0
1
0
Order By: Relevance
“…The second option considered is heat recovery from wastewater. In this case, a commercial HUBER TM ThermWin system (HUBER SE, Berching, Germany [26]) was installed, as shown in Figure 5. The system is composed of a connection with the bottom of the sewer pipe, a shaft equipped with a screen, an aboveground heat exchanger, and a heat pump.…”
Section: Heat Recovery From Wastewatermentioning
confidence: 99%
“…The second option considered is heat recovery from wastewater. In this case, a commercial HUBER TM ThermWin system (HUBER SE, Berching, Germany [26]) was installed, as shown in Figure 5. The system is composed of a connection with the bottom of the sewer pipe, a shaft equipped with a screen, an aboveground heat exchanger, and a heat pump.…”
Section: Heat Recovery From Wastewatermentioning
confidence: 99%