2010
DOI: 10.1016/j.pursup.2010.08.002
|View full text |Cite
|
Sign up to set email alerts
|

Partnering relationships in construction: A literature review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
175
0
2

Year Published

2016
2016
2023
2023

Publication Types

Select...
6
4

Relationship

0
10

Authors

Journals

citations
Cited by 197 publications
(210 citation statements)
references
References 98 publications
2
175
0
2
Order By: Relevance
“…In another similar research, the same researchers developed a model for design and construction contracts through application of regression (Lam et al, 2008). In another research, Cheung et al (2008) On the other hand, several methods have been used for anticipation as follows,  Time series (Hwang, 2011;Wong et al, 2007)  Various regression methods (Cheung et al, 2010;Hwang, 2008;Wang & Gibson, 2010)  Neural networks (Cheung et al, 2006;Chua et al 1997;Ko & Cheng, 2007;Wang & Gibson, 2010)  Fuzzy logics (Ko & Cheng, 2007;Li et al, 2006;Young & Poon, 2013) In previous researches, most researchers and authors have recommended future researchers to provide their anticipator models with respect to things like localization in other countries, application of more precise and simple methods and a model for different phases of a project (Bygballe et al, 2010;Chang et al, 2013;davis, 2013;Eigbe et al, 2014;Han et al, 2007;Han et al , 2007;Petro & Gardiner, 2015).…”
Section: Anticipation Of Project Successmentioning
confidence: 99%
“…In another similar research, the same researchers developed a model for design and construction contracts through application of regression (Lam et al, 2008). In another research, Cheung et al (2008) On the other hand, several methods have been used for anticipation as follows,  Time series (Hwang, 2011;Wong et al, 2007)  Various regression methods (Cheung et al, 2010;Hwang, 2008;Wang & Gibson, 2010)  Neural networks (Cheung et al, 2006;Chua et al 1997;Ko & Cheng, 2007;Wang & Gibson, 2010)  Fuzzy logics (Ko & Cheng, 2007;Li et al, 2006;Young & Poon, 2013) In previous researches, most researchers and authors have recommended future researchers to provide their anticipator models with respect to things like localization in other countries, application of more precise and simple methods and a model for different phases of a project (Bygballe et al, 2010;Chang et al, 2013;davis, 2013;Eigbe et al, 2014;Han et al, 2007;Han et al , 2007;Petro & Gardiner, 2015).…”
Section: Anticipation Of Project Successmentioning
confidence: 99%
“…There are several traits of suppliers' relationships. Firstly, their relationships are different from owner-contractor and contractorsubcontractor relationships that have been analyzed earlier [11]. The difference is that the relationships between suppliers are noncontractual relationships, while general relationships in project networks are contractual ones [12].…”
Section: Introductionmentioning
confidence: 96%
“…In a well working supply chain the coordination of all participants of the overall house project is an important aspect to delivering the house on time, with low costs and high quality standards (Lessing, 2006;Grundke & Wildemann,to the delivery of the house (Bygballe;Jahre & Swärd, 2010). The high number of companies involved in the process as well as the transportation and the construction/assembly of the modules on-site are some of the complexity drivers for the supply chain management (Arantes;Ferreira & Costa, 2015;Cheng;Law;Bjornsson;Jones & Sriram, 2010).…”
Section: Introductionmentioning
confidence: 99%