2014
DOI: 10.1016/j.jhydrol.2014.04.012
|View full text |Cite
|
Sign up to set email alerts
|

Parameter uncertainty analysis of reservoir operating rules based on implicit stochastic optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
45
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
9

Relationship

2
7

Authors

Journals

citations
Cited by 91 publications
(46 citation statements)
references
References 52 publications
0
45
0
Order By: Relevance
“…The main objective of the optimization model is to meet the demand and minimize the total pumping cost for monthly operation considering the uncertainty in reservoir inflow under climate change. Firstorder Markov chain is most commonly used to handle uncertainty in reservoir operation (Fu et al, 2013;Liu et al, 2014). However, in the present study, an alternative approach based on future climate input was employed to handle uncertainty in reservoir inflow.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The main objective of the optimization model is to meet the demand and minimize the total pumping cost for monthly operation considering the uncertainty in reservoir inflow under climate change. Firstorder Markov chain is most commonly used to handle uncertainty in reservoir operation (Fu et al, 2013;Liu et al, 2014). However, in the present study, an alternative approach based on future climate input was employed to handle uncertainty in reservoir inflow.…”
Section: Methodsmentioning
confidence: 99%
“…A deterministic optimization process was performed to develop an optimal rule curve for the multi-source single reservoir system using mixed Integer Linear Programming (MILP). MILP is widely used for reservoir rule curve optimization across the world (Lima Silva et al, 2013;Liu et al, 2014;Heydari et al, 2015).…”
Section: Methodsmentioning
confidence: 99%
“…e reservoir management agency (such as the Royal Irrigation Department of ailand) needs to plan in advance the appropriate volume of water in the reservoir (at each time interval) for storage and release of water for various purposes [2], including the implementation of the plan as long as the relevant factors in the future have not changed from the original. However, if future conditions are different from those anticipated in the planning phase, performance may differ from planned to minimize water shortage or overflow.…”
Section: Introductionmentioning
confidence: 99%
“…and least-squares SVM (LS-SVM) have been widely used. By analyzing the optimal trajectory, Liu et al (2014) concluded that LR operating rules were suitable for the hydropower operation of China's Three Gorges Reservoir, and implemented an uncertainty analysis for future parameter values. Celeste and Billib (2009) determined that the SURF model was the best in terms of overall performance for the Epitácio Pessoa Reservoir, whereas Ji et al (2014) proposed SVM operating rules for the Jinsha Reservoirs system, demonstrating the effectiveness of SVMs for such scenarios.…”
Section: Introductionmentioning
confidence: 99%