2009
DOI: 10.1016/j.apradiso.2009.03.099
|View full text |Cite
|
Sign up to set email alerts
|

Overview of the IBA accelerator-based BNCT system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2011
2011
2020
2020

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 22 publications
(11 citation statements)
references
References 1 publication
0
11
0
Order By: Relevance
“…This same machine, with an upgraded ion source, is proposed as the core of a BNCT facility which is intended to operate at 2.8 MeV and 20 mA on a thin solid Li target at about 0.5 kW cm −2 power density. 23 Another facility under development is based on a vacuum insulated compact tandem at the Budker Institute of Nuclear Physics in Novosibirsk, Russia. 24 The goal for this facility is the production of near-threshold neutrons from the p+ 7 Li reaction at about 1.9 MeV and currents up to 10 mA.…”
Section: Electrostatic Acceleratorsmentioning
confidence: 99%
“…This same machine, with an upgraded ion source, is proposed as the core of a BNCT facility which is intended to operate at 2.8 MeV and 20 mA on a thin solid Li target at about 0.5 kW cm −2 power density. 23 Another facility under development is based on a vacuum insulated compact tandem at the Budker Institute of Nuclear Physics in Novosibirsk, Russia. 24 The goal for this facility is the production of near-threshold neutrons from the p+ 7 Li reaction at about 1.9 MeV and currents up to 10 mA.…”
Section: Electrostatic Acceleratorsmentioning
confidence: 99%
“…One more Japanese project is developing at Nagoya University of [44]. The company Ion Beam Application (IBA, Belgium) is developing a 1.9 to 2.8 MeV 15 mA Dynamitron [45]. In the future there will be developed new projects of accelerators as a vector of development of BNCT in the field of getting of neutrons beam shifted towards compact units-based accelerators.…”
Section: Experimental Researchmentioning
confidence: 99%
“…The execution of the contract was halted by mutual consent of the parties due to difficulties constructing the accelerator there. But despite termination of the contract, the studies at Dinamitron were continued [53] and in 2013 an agree ment was reached on the delivery of the accelerator with a current of 15 mA at the University of Nagoya (Japan) [54].…”
Section: Charged Particle Accelerators For Bnctmentioning
confidence: 99%
“…In the American project of linac, the target is modified in the form of the cone [122]. In the project of the IBA Co., the target consists of two inclined plates [53], and of one inclined plate in the Korean project [123]; all the projects have nearly same parameters.…”
Section: Construction Of the Neutronmentioning
confidence: 99%