ORBIT: Offshore Renewables Balance-of-System and Installation Tool

Abstract: Department of Energy (DOE) reports produced after 1991 and a growing number of pre-1991 documents are available free via www.OSTI.gov.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
28
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
3

Relationship

3
5

Authors

Journals

citations
Cited by 21 publications
(28 citation statements)
references
References 13 publications
(24 reference statements)
0
28
0
Order By: Relevance
“…We increased the assumed lease/site auction price in ORCA from $50 million to $100 million to match the default assumption in ORBIT (Nunemaker et al 2020). The auction price is the amount paid by the developer through the federal leasing process to obtain site control, and the increase reflects higher prices paid in more recent auctions on the U.S. East Coast (Musial et al 2019b).…”
Section: Lease Pricementioning
confidence: 99%
See 2 more Smart Citations
“…We increased the assumed lease/site auction price in ORCA from $50 million to $100 million to match the default assumption in ORBIT (Nunemaker et al 2020). The auction price is the amount paid by the developer through the federal leasing process to obtain site control, and the increase reflects higher prices paid in more recent auctions on the U.S. East Coast (Musial et al 2019b).…”
Section: Lease Pricementioning
confidence: 99%
“…This would require an offshore wind project to use more export cables with smaller power ratings. We used NREL's Offshore Renewables Balance-of-system and Installation Tool (ORBIT) to determine how this would cause export system costs to scale (Nunemaker et al 2020). The lower capacity export cables are cheaper than the 300-MW rated baseline; however, the 135-MW constraint requires 5 export cables for a 600-MW wind power plant instead of 2 higher capacity cables.…”
Section: Electrical Infrastructure Costsmentioning
confidence: 99%
See 1 more Smart Citation
“…We estimated CapEx using ORBIT for balance-of-system costs. Soft costs are estimated based on the methodology from ORCA (Nunemaker et al 2020;Beiter et al 2016). Turbine CapEx is assumed to remain constant with the "2019 Cost of Wind Energy Review" based on industry data analyzed in the "Offshore Wind Market Report: 2021 Edition" (Stehly et al 2020;Musial et al 2021).…”
Section: Offshore Wind Capital Expendituresmentioning
confidence: 99%
“…We applied deployment and capital expenditure results from ReEDS to estimate supply chain impacts using a variety of tools, including NREL's Wind-plant Integrated System Design and Engineering Model (WISDEM®) for wind turbine costs and materials (Ning et al 2014), and Offshore Renewables Balance-of-System Installation Tool (ORBIT) for balance-of-system costs (Nunemaker et al 2020). ReEDS provided a deployment figure and capital expenditures broken down by region at each time step in the simulation.…”