Optimizing the schedule of dispatching RMC trucks through genetic algorithms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
52
0
2

Year Published

2004
2004
2023
2023

Publication Types

Select...
5
3
2

Relationship

0
10

Authors

Journals

citations
Cited by 85 publications
(60 citation statements)
references
References 5 publications
0
52
0
2
Order By: Relevance
“…Para a modelagem da programação de caminhões no transporte de cargas, podem ser citados os trabalhos de Powell et al (1984), Bausch et al (1994), Hatori (2000), Morabito e Vasco (2011), Stojanovic et al (2011). No transporte de concreto usinado para obras de construção civil, algumas abordagens são apresentadas por Feng et al (2004), Feng e Wu (2006), Yan e Lai (2007), Lin et al (2010), Choi e Nieto (2011), Yan et al (2011) e Cortes e Cunha (2014.…”
Section: Introductionunclassified
“…Para a modelagem da programação de caminhões no transporte de cargas, podem ser citados os trabalhos de Powell et al (1984), Bausch et al (1994), Hatori (2000), Morabito e Vasco (2011), Stojanovic et al (2011). No transporte de concreto usinado para obras de construção civil, algumas abordagens são apresentadas por Feng et al (2004), Feng e Wu (2006), Yan e Lai (2007), Lin et al (2010), Choi e Nieto (2011), Yan et al (2011) e Cortes e Cunha (2014.…”
Section: Introductionunclassified
“…A common approach adopted in the literature to account for uncertainty and project-specific conditions in planning and analysis is discrete-event simulation (DES). DES has been used widely in previous studies to experiment with different construction processes [144][145][146][147][148][149]. Furthermore, DES has been used in several studies to estimate the carbon emissions of a number of construction operations including earthmoving [107,138,150], asphalt paving operation [151], tower crane swing operation [152] and highway construction projects [134].…”
Section: Accounting For Uncertainty and Site-specific Conditionsmentioning
confidence: 99%
“…The RMC supply process can be divided into five major components (Feng et al, 2004) which are Material production, Production loading, Truck transport, RMC placement and Truck return as shown in Fig. 1.…”
Section: Principle and Modeling Of Rmc Dispatchingmentioning
confidence: 99%