2021
DOI: 10.23917/jiti.v20i1.13894
|View full text |Cite
|
Sign up to set email alerts
|

Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing

Abstract: Preventive maintenance is a planned and scheduled maintenance method that is carried out before a machine failure occurs. The maintenance schedule can be determined based on experience, historical data, or recommendations. Selecting the maintenance schedule greatly affects the production system. The Clin machine in cement manufacturing has an important role in the cement production process. During treatment, the client machine cannot produce clinker, so it is necessary to plan a production system to meet the d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 8 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?